| Description |

| Inspection |
| 1. |
There should be continuity between the No.15 and No.7 terminals when
power and ground are connected to the No.15 and No.14 in the ICM-A.
|
| 2. |
There should be continuity between the No.10 and No.12 terminals when
power and ground are connected to the No.15 and No.14 in the ICM-A.
|
| 1. |
There should be continuity between the No.11 and No.12 terminals when
power and ground are connected to the No.11 and No.1 in the ICM-A.
|
| 2. |
There should be continuity between the No.10 and No.7 terminals when
power and ground are connected to the No.11 and No.1 in the ICM-A.
|
Description and operation Dscription and Operation ICU (Integrated Central Control Unit) ICU (Integrated Central Control Unit) is an integrated model of smart junction block and central gateway.