| Component Location |

| 1. Rear glass defogger relay
(Buil-in engine room relay box) 2. Rear glass defogger switch (Dual type) |
3. Rear glass defogger |
Repair procedures Inspection Wrap tin foil around the end of the voltmeter test lead to prevent damaging the heater line.
Repair procedures Replacement 1. Disconnect the negative (-) battery terminal. 2. Remove the heater and blower assembly. (Refer to Heater - "Heater Unit") 3.
Components and components location Components 1. Warning indicator 2. SVM camera Repair procedures Removal 1. Disconnect the negative (-) battery terminal. 2.